Zhejiang Shaoxing Industrial Park 2 MW / 4 MWh optical storage project (commissioned in July 2021)
1 Overall project scale
• Distributed PV: 14.5 MWp (construction in three phases, rooftop BAPV/BIPV hybrid)
• Behind-the-meter energy storage: 2 MW / 4 MWh (two 0.5 MW / 1 MWh containers + one 1 MW / 2 MWh container)
• Access voltage: 10 kV grid-connected, T connected to the park power distribution room
2 Detailed parameters of energy storage system
Battery type Lithium Iron Phosphate (LFP)
Rated capacity 2 MW / 4 MWh (0.5 C)
Battery group 1P16S module → 8 modules connected in series into clusters → 14 clusters connected in parallel to form 1 battery stack
The power of a single battery stack is ≈ 1 MWh (can be switched independently)
DC link voltage range 600–850 V
Energy storage converter (PCS) 500 kW / 1000 kW dual power module, three-level topology, efficiency ≥ 96 %, four-quadrant operation
Energy Management System (EMS) Huawei SmartPV + Shenrui EMS, supporting peak shaving and valley filling, demand management, and one-stop